Applied Digital has signed a 210 MW lease at Delta Forge 2...  Read More >>

An Applied Digital Original Docuseries

Behind the Build

What does it actually take to build a multi-billion AI data center campus in rural North Dakota — on a fixed deadline, with no room for error?

Episode 1: The Race to Bring AI Data Centers Online

What does it actually take to build a multi-billion AI data center campus in rural North Dakota — on a fixed deadline, with no room for error?

Episode 2: When AI Comes to a Small Town

A look inside the community conversations behind a new AI infrastructure project in Harwood, North Dakota — where residents have real questions and trust has to be earned face to face.

Episode 3: Designing at the Speed of Construction

“The Space Between Delivery and Design,” Applied Digital takes viewers inside Polaris Forge 2, where construction is already moving and the technical fit-out is still being refined in real time.

Episode 4: Inside the Loop

There is a growing misconception that all AI data centers consume massive amounts of water for cooling. Applied Digital's do not.

Episode 5: Power Demand

We return to Polaris Forge 2 in Harwood, North Dakota, to follow how electricity moves through an AI Factory — from incoming utility power to the systems that protect, transform and ultimately distribute it to high-density AI infrastructure.

Episode 6: The Responsibility of Reliability

In Episode 6 of Behind the Build, "The Responsibility of Reliability," we visit Polaris Forge 2 in Harwood, North Dakota, with Brent Lundstrom, Applied Digital’s Site Director of Operations. A North Dakota native, Brent is preparing the team that will run the facility - and taking on a new chapter in his career close to home.

Build with Confidence. Scale with Certainty.

Partner with Applied Digital to develop infrastructure built for long-term performance.

Connect Today
Awards & Recognition